Technical Documentation & Updates

Updated at May 20 , 2020

The purpose of this blog entry is to keep you informed about the latest updates and new publications for SMA devices released by the technical documentation team. This information will be made available regulary. This means that you will always be kept up to date and will never miss any changes or anything new that is published.

Latest Technical and Product Documentation

The following product-related documents have been updated and published for the first time and are available for download from the Download Area at www.SMA.de/en:

SUNNY TRIPOWER 15000TL / 20000TL / 25000TL – The versatile specialist for large-scale commercial plants and solar power plants (only for Australian market)
Datasheet
STP15-25TL-30-AU-DS-en-40.pdf

 

MULTICLUSTER BOX 12-3-20
Installation Guide
MC-BOX-36-IAA-en-22W.pdf

MULTICLUSTER BOX 6.3-11
Short User Manual
MC-BOX-6-IAU-en-12.pdf

MULTICLUSTER-BOX 12.3-20
Installation Guide
MC-BOX-12-3-20_IAA-en-17.pdf

SUNNY DESIGN
User Manual
SD3-SDW-BA-en-23.pdf

 

Modbus list for STP8.0-3AV-40 / STP10.0-3AV-40 (Sunny Tripower 8.0 / 10.0) with firmware package 3.10.08.R – HP 1: Country data set with specification of year < 2018
Technical information
MODBUS-HTML_STP8.0-10.0-3AV-40_V10.zip

Modbus list for SUNNY TRIPOWER 8.0-3AV-40 / STP10.0-3AV-40 (Sunny Tripower 8.0 / 10.0) with firmware package 3.10.08.R – HP2: Country data set with specification of year ≥ 2018 (SMA Grid Guard 10.0)
Technical information
MODBUS-HTML_STP8.0-10.0-3AV-40_GG10_V10.zip

Modbus list for SUNNY TRIPOWER 50-40 / STP50-JP-40 (Sunny Tripower CORE1) – HP1: Country data set with specification of year ≥ 2018 must be set (SMA Grid Guard 10.0)
Technical information
MODBUS-HTML_STP 50-40JP-40_V12.zip

 

SUNNY BOY 5.5-JP
Operating Instructions
SB55-LV-JP-41-BE-en-11.pdf

 

SUNNY TRIPOWER STP8.0-3AV-40 / STP10.0-3AV-40 (Sunny Tripower 8.0 / 10.0) with firmware package 3.10.08.R – HP2: Country data set with specification of year ≥ 2018 (SMA Grid Guard 10.0)
Technical information
PARAMETER-HTML_STP8.0-10.0-3AV-40_GG10_V10.zip

SUNNY TRIPOWER 50-40 / STP50-JP-40 as of firmware version V3.10.06.R (Sunny Tripower CORE1) – HP1 – Country data set with specification of year ≥ 2018 must be set (SMA Grid Guard 10.0)
Technical information
PARAMETER-HTML_STP 50-40JP-40_V12.zip

SUNNY TRIPOWER 50-40 / STP50-JP-40 as of firmware version V3.10.06.R (Sunny Tripower CORE1) – HP 2 – Country data set with specification of year ≥ 2018 must be set (SMA Grid Guard 10.0)
Technical information
PARAMETER-HTML_STP 50-40JP-40_GG10_V12.zip

SUNNY TRIPOWER 8.0-3AV-40 / STP10.0-3AV-40 (Sunny Tripower 8.0 / 10.0) with firmware package 3.10.08.R – HP 1: Country data set with specification of year < 2018
Technical information
PARAMETER-HTML_STP8.0-10.0-3AV-40_V10.zip

SUNNY TRIPOWER 15000TL / 20000TL / 25000TL – The versatile specialist for large-scale commercial plants and solar power plants
Datasheet
STP15-25TL-30-DS-en-40.pdf

SUNNY HIGHPOWER PEAK3
Operating Instructions
SHP-20-BE-en-11.pdf

SUNNY HIGHPOWER PEAK3 (SHP 100-20 / SHP 150-20 / SHP 125-US-20 / SHP 150-US-20) – HP
1: Country data set with specification of year < 2018
Technical information
PARAMETER-HTML_SHPxxx-20_V11.zip

SUNNY HIGHPOWER PEAK3 (SHP 100-20 / SHP 150-20 / SHP 125-US-20 / SHP 150-US-20) – HP
2: Country data set with specification of year ≥ 2018 (SMA Grid Guard 10.0)
Technical information
PARAMETER-HTML_SHPxxx-20_GG10_V11.zip

 

 

Links for more information

SMA Download Area

SMA FAQ & Support

SMA on Twitter

If you have further questions, please write an e-mail to SocialMedia@SMA.de.